Omico Copper Limited
Background
IBML owns 46.3% of Omico Copper Limited based in Mauritius which in turn owns 95% of Craton Mining and Exploration (Pty) Ltd in Namibia. Craton maintains Mining Licence ML197 which covers the Omitiomire Copper project areas. Omico Copper Limited is fully funded and is committed to investing USD5.0 million in the production of a Bankable Feasibility Study (BFS) planned to be complete by calendar year end 2022. Omico also hold Exploration Licence EPL3589 covering 735km2 which can be broadly described as the ground surrounding the mining licence.
Omitiomire project area
Geology of the Omitiomire Deposit
Drill section showing stacked ore lenses. The numbers on the right-hand side of the figure show elevation above sea level
In August 2014, Bloy Resource Evaluation (‘Bloy’) provided an updated resource estimate of 137 million tonnes (‘Mt’) at an average grade of 0.54% copper (‘Cu’) at a cut-off grade of 0.25% Cu. The resources are reported in accordance with the guidelines set out by the Joint Ore Reserves Committee (JORC, 2012). The Measured and Indicated categories constitute 71% of the deposit.
Table 2. Omitiomire resource at a cut-off grade of 0.25% Cu (Bloy, 2014).
Note: The resource figures are not constrained within any form of resource limiting pit shell
Note: The technical information relating to the Omitiomire resource has been summarised from a report, dated 31 August 2014, provided to Craton by Ms Carrie Nicholls and Mr Michael Rohwer of Bloy Resource Evaluation. Both Ms Nicholls and Mr Rohwer are Members of the Australasian Institute of Mining and Metallurgy and have sufficient experience to qualify as Competent Persons as defined in the September 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Ms Nicholls and Mr Rohwer consent to the inclusion of the information in the form and context in which it appears.
Primary copper mineralisation occurs mainly as the mineral chalcocite (Cu2S) with minor bornite (Cu5FeS4) within bands of mafic (amphibole-biotite-plagioclase) schist. There are no iron sulphides (pyrite or pyrrhotite). The highest copper grades are associated with bands of strongly-deformed epidote-biotite schist. Inter-banded felsic (quartz-plagioclase-biotite) gneiss is barren. Banding is on a scale of centimetres to metres in thickness.
Sawn NQ drill core showing the banded nature of Omitiomire ore.
The steel-grey mineral is chalcocite and the brown-coloured mineral is chrome-epidote
Primary sulphide copper is oxidised to 20m depth and partly oxidised to 40m depth. Oxide copper occurs mainly as the mineral malachite (green hydrated copper carbonate) with subordinate chrysocolla (blue hydrated copper silicate) and minor tenorite (black copper oxide). The proportion of primary chalcocite increases with depth.
Omitiomire oxide copper ore. The green mineral is malachite; the blue-green mineral is chrysocolla
Omitiomire Copper Project - Mini Mining
Proposed processing route for oxide copper ore
- Complete the sale of a minority stake in Craton to approved Namibian group(s);
- Complete an access agreement with the farm Omitiomire;
- Collect a bulk sample and conduct metallurgical tests;
- Carry out external studies of the project including a review of the metallurgical process;
- Revise the capital & operating costs and finalise the financial model;
- Carry out detailed mine and process plant design;
- Proceed to construction.
Proposed Phase 2 Sulphide Copper Project
Drill core showing copper-bearing mafic bands and barren felsic bands
Phase 2 project: Proposed process flow chart
- A 90 km water pipeline to connect the project to the Namibian water supply network;
- A 115 km power line to connect the project to the Namibian power grid;
- Road upgrades either to transport copper concentrate to the existing railway at Nossob siding, or to connect to existing sealed roads to the port at Walvis Bay on the Atlantic coast;
- An on-site village to accommodate the workforce;
- A river diversion around the proposed open-cut mine.
Infrastructure upgrades proposed for the Phase 2 operation (from 2010 PFS)
Craton intends to commence a Phase 2 Definitive Feasibility Study (‘DFS’) when the “Mini Mine” is in operation, providing cash flow for the study. It is anticipated that the larger project would be based on the deeper sulphide copper resource at Omitiomire plus other copper resources which might be discovered within trucking distance of Omitiomire. This project will require a separate SEIA and Environmental Management Plan.
Note: The technical information contained in this document was compiled by Dr Ken Maiden, a Director of International Base Metals Limited. Dr Maiden is a Member of the Australian Institute of Geoscientists and a Fellow of the Australasian Institute of Mining and Metallurgy. He has sufficient experience to qualify as a Competent Person as defined in the September 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code)”. Dr Maiden consents to the inclusion of the matters in the form and context in which they appear.